| Resume Details |
| Resume was added: |
16 Nov,2005 |
|
Name: Kokkeong Tee
|
| Gender: |
Male |
| Age: |
35 years |
| Marital status: |
Single |
| Address: |
NO:35, JALAN 14/61, 46100 |
| City: |
PETALING JAYA |
| State: |
SELANGOR |
| Country: |
167 |
| E-mail: |
Send message
|
| Education |
| Institution: |
The Nottingham Trent University |
| City / Country: |
Nottingham/United Kingdom |
| Start date: |
01 Sep,2000 |
| End date: |
01 Jun,2001 |
| Degree: |
B.Eng(Hons)Electrical&Electronic Engineering |
| Major: |
Telecommunication |
| Thesis: |
Antenna and Radiation Pattern (Multimedia) |
Comments:
In my final year, I learnt Microwave Technique and Radio Propagation as well as Network Communication as my core subjects. In addition, I also learnt Photonic and Digital Signal Processing and Control System as my electives. Apart from that, my final year project involved multimedia where I worked very closely with my project supervisor, Mr. David Downes, in developing Engineering softwares. |
|
| Institution: |
The Nottingham Trent University |
| City / Country: |
Nottingham/United Kingdom |
| Start date: |
01 Dec,1999 |
| End date: |
01 May,2000 |
| Degree: |
BTEC Higher National Diploma |
| Major: |
Electrical & Electronic |
| Thesis: |
Learning Electronics Through Multimedia |
|
| Institution: |
Institute Megatech |
| City / Country: |
Kuala Lumpur/Malaysia |
| Start date: |
01 Apr,1995 |
| End date: |
01 Mar,1998 |
| Degree: |
First Class Diploma in Electrical & Electronic Engineering |
| Major: |
Electrical & Electronic Engineering |
| Thesis: |
Electrical Control Using Triac and 555 Timer |
Comments:
3 Years Diploma course |
| Work Experience |
| Company: |
ADA Cellworks |
| City / Country: |
Petaling Jaya/Malaysia |
| Position: |
Senior RF Engineer (IBS) |
| Start date: |
01 Jun,2005 |
| Present: |
Yes |
Responsibilities:
1.To perform in-building survey, data analysis and frequency collection using NEMO (NOKIA)
2.To produce and optimise 3G RF In-Building design based on IEEE P802.15 method (MORAN).
3.Traffic and bit rate calculation.
4.Doing pre-survey for in-buildings by obtaining floor plans and to liaise with building managers for access during project.
5.To attend meetings and RF discussion with customers.
6.Project and technical presentation.
7.Projects Involvement (NOKIA)
•OPTUS and Vodafone (Australia)
Westfield Bondi Junction, Westfield, Eastgarden, Optus Centre Wooloongabba, Optus Centre Fortitude Valley, Optus Centre Comalco Place, Flinders Train Station, Flagstaff Train Station, Museum Train Station, Parliament Train Station, Melbourne International Airport, 50 Miller Street, Westfield Liverpool, Westfield Hornsby.
|
|
| Company: |
Unicom |
| City / Country: |
Petaling Jaya/Malaysia |
| Position: |
Senior RF Engineer (Contract) |
| Start date: |
01 Mar,2005 |
| End date: |
01 May,2005 |
Responsibilities:
1.To carry out in-building survey, data analysis and frequency collection using TEMS.
2.To produce RF In-Building design based on IEEE P802.15 method.
3.Doing pre-survey for in-buildings by obtaining floor plans and to liaise with building managers for access during project.
4.To attend meetings and RF discussion with customers.
5.Project and technical presentation.
6.Technical project bidding.
-Projects Involvement (Ericsson)
•Maxis
Resort Hotel (Genting), Menara UOB, Tesco Klang, Tesco Mutiara Damansara, Plaza Kotaraya
•Celcom
City Bayview Hotel (Penang), Motorola Penang, Pusat Islam Johor, Perling Mall Johor, PUTRA LRT, Plaza Kotaraya
|
|
| Company: |
Trisilco Folec |
| City / Country: |
Petaling Jaya/Malaysia |
| Position: |
RF Engineer (IBS) |
| Start date: |
01 Jul,2002 |
| End date: |
01 Feb,2005 |
Responsibilities:
1.Coordination between customers and subcontractors so as to ensure that the in-building design is in accordance with customers’ specification.
2.To carry out in-building survey, data and frequency collection.
3.To produce RF In-Building design based on IEEE P802.15 method.
4.To conduct Site Variation Order (SVO) and outdoor RF testing for customers.
5.Doing pre-survey for in-buildings by obtaining floor plans and to liaise with building managers for access during project.
6.Projects Involvement
•DiGi
Selayang Mall, Sunway Pyramid, Seremban Parade, 1-Utama phase 2 (CAS Tender), The Mall KL, UDA Ocean KL, Club de Macau (Renaissance Hotel), Menara Citibank, J.W. Marriott Hotel KL, Sungei Wang Plaza, Low Yatt Plaza, Lot 10 KL
•Maxis
Sin Mah Shopping Complex KL, SONY Prai, Menara Chan, Menara Maxis, Ikea, Highland Hotel, International Offshore Financial Centre Labuan, Riverside Majestic Kuching, Wisma Sime Darby
|
|
| Company: |
Comintel |
| City / Country: |
Petaling Jaya/Malaysia |
| Position: |
Engineer |
| Start date: |
01 Feb,2002 |
| End date: |
01 May,2002 |
Responsibilities:
Trouble-shooting of telecommunication equipment.
|
|
| Company: |
A&A Telecommunication |
| City / Country: |
Petaling Jaya/Malaysia |
| Position: |
Transmission Engineer (Contract) |
| Start date: |
01 Jan,2002 |
| End date: |
01 Feb,2002 |
Responsibilities:
1.Testing and commissioning of Microwave Links for customers.
2.Projects Involvement
•EVOLIUM Microwave (ALCATEL) Short-Haul, installation of Microwave links for customers and ensuring that the microwave links free from bugs.
|
|
| Company: |
Techsource System |
| City / Country: |
Kuala Lumpur/Malaysia |
| Position: |
Application Engineer |
| Start date: |
01 Aug,2001 |
| End date: |
01 Jan,2002 |
Responsibilities:
1.Providing consultation of Engineering Software like MATLAB and SIMULINK to the Telecommunication arena.
2.Providing seminars, presentation and info day to the Educational Sectors such as local and private Universities in the Southern Region.
|
|
| Company: |
Optimax Laser Eye Centre |
| City / Country: |
Kuala Lumpur/Malaysia |
| Position: |
Laser Technician |
| Start date: |
01 May,1998 |
| End date: |
01 May,1999 |
Responsibilities:
1.Maintaining the laser machine (Nidek EC-5000) so as to ensure the smooth flowing of the laser machine.
2.Calibration, cleaning of system optics and alignment of the laser machine.
3.Assisting ophthalmologist in overall operation.
|
| Extracurricular Activities |
| Organization: |
Buddhist Maha Vihara |
| City / Country: |
Kuala Lumpur/Malaysia |
| Start date: |
01 Apr,1994 |
| Present: |
Yes |
| Responsibilities: |
1.To guide and propagate the Buddha`s teaching (Dhamma)
2.Monthly visit to the old folks` home. |
| Languages |
| Language: |
Chinese (Simplified) |
| Spoken level: |
Basic |
| Written level: |
Basic |
|
| Language: |
English |
| Spoken level: |
Fluent |
| Written level: |
Fluent |
|
| Language: |
Japanese |
| Spoken level: |
Basic |
| Written level: |
Basic |
| Additional |
Computer skills:
C Programming, MATLAB, Lingo, Macromedia Director, Adobe Photoshop 5.5, Adobe Image Ready 5.0, Ulead, Microsoft Office 2000, Microsoft Windows NT 4.0, Netscape, Internet Explorer 5.0, Extreme 3D |
Other skills:
1.RF Skills:ALCATEL-Nectas, Ericsson TEMS, NOKIA NEMO,Enritsu SiteMaster, NOKIA Net Monitor, RF Indoor Planning (2G and 3G), MORAN
2.Laser Skills:System Optics, Laser machine calibration
3.Microwave Skills:Indoor and Outdoor Unit, Coupler, Microwave Dish
4.Electronics Skills:VHF/UHF Radio, Power Supply, Power Amplifier
5.PLC Skill:SHARP PLC
6.Presentation Skills:Public Speaking and Product Demonstration |
Hobbies:
1.Bodybuilding
2.Meditation
3.Swimming
4.Basketball
5.Reading |
| Vacancy |
| Category: |
Consultancy, Engineering |
| Specific: |
RF Planning Design |
| Timing: |
Full Time, Part Time |
| Place of work/Country: |
Australia, China, France, Greece, Hong Kong, Japan, Malaysia, New Zealand, Singapore, Taiwan, Thailand, United Kingdom, USA, Vatican City (use +39) |
Motivation / Comments / Requests:
My objective is to gain further knowledge in the world of telecommunication. |
|
|
| Telecom Job Search Engine Statistics |
Telecom Vacancies in database: 985
Telecom Resumes in database: 111
Users Online: 43
|
|
| Telecom Job Search Engine Contacts |
| If you have any constructive thoughts, creative ideas, or reasonable offers, please, contact us immediately via e-mail
|
|
|
|