| Resume Details |
| Resume was added: |
30 Jul,2005 |
|
Name: Francisco Sahagun
|
| Gender: |
Male |
| Age: |
55 years |
| Marital status: |
Married |
| Address: |
#246 Sta. Maria Street , Bo. San Jose |
| City: |
Castillejos |
| State: |
Zambales |
| Country: |
204 |
| E-mail: |
Send message
|
| Education |
| Institution: |
Lorraine Technical School |
| City / Country: |
Olongapo City, Philippines |
| Start date: |
01 Jun,1974 |
| End date: |
01 Mar,1975 |
| Degree: |
Electronics Serviceman Mechanic |
|
| Institution: |
Olongapo city National High School |
| City / Country: |
Olongapo city, Philippines |
| Start date: |
01 Jun,1970 |
| End date: |
01 Mar,1974 |
| Degree: |
Secondary School Graduated |
| Work Experience |
| Company: |
Lucent Technologies International Inc. |
| City / Country: |
Riyadh, Saudi Arabia |
| Position: |
Installation Coordinator(Project control) |
| Start date: |
01 Jun,2000 |
| End date: |
01 Dec,2002 |
Responsibilities:
Coordinate all Installation and Preliminary Acceptance Test(PAT) activity Kingdom wide for telecommunications projects such as WLL, Switching, Transmission, CDMA Projects, Motorola, Power and GSM equipments of Saudi Telecom Company.
|
|
| Company: |
Lucent Technologies International In. |
| City / Country: |
Alkhobar, Saudi Arabia |
| Position: |
Installations & Test Coordinator |
| Start date: |
01 Jun,1996 |
| End date: |
01 Jun,2000 |
Responsibilities:
·Co-ordinating the installation and test activities. Assign and direct the work engaged in the Telecommunication Installation/Test of all kinds of Lucent Telecommunication Equipment’s such as 5ESS SWITCHING EQUIPMENTS, CDMA Equipments with Radio Carrier stations, TRANSMISSION EQUIPMENTS SUCH AS SDH/ISM EQUIPMENTS, DACS5, DACS6, DACS 4/4/1, DACS II, WAVESTAR OLS80G, SLM 2000, SLR 2000, WAVESTAR ADM16/1, ADM4, ANYMEDIA ACCESS System, ATM Access, AT&T-LUCENT POWER PLANT, GSM EQUIPMENTS SUCH as RBS, BSC, MSC, MOTOROLA and other type of telecom equipments under (TEP-6/7) Telephone
·Provide administrative and technical supervision to 12 Test Engineers, 6 Installation Supervisor and 24 Telephone Installer.
|
|
| Company: |
AT & T International |
| City / Country: |
Alkhobar, Saudi Arabia |
| Position: |
Senior Installation Supervisor |
| Start date: |
01 Jan,1995 |
| End date: |
01 May,1996 |
Responsibilities:
·Plans, sequence of work operation for group supervised.
·Assign and direct the work engaged in the Telecommunication Installation/Test of all kinds of Lucent Telephone Equipment’s such as 5ESS Switching, CDMA equipments with Radio Carrier stations(RCS), TRANSMISSION EQUIPMENTS-SDH/ISM EQUIPMENTS, DACS5, DACS6, DACS 4/4/1, DACS II, WAVESTAR OLS80G, SLM 2000, SLR 2000, WAVESTAR ADM16/1, ADM4, ANYMEDIA ACCESS System, ATM Access AT&T-LUCENT POWER PLANT, MOTOROLA Equipt., GSM EQUIPMENTS etc under (TEP-6/7) Telephone Expansion Project-6-7, Saudi Telephone Company (STC) KSA.
· Instruct and train subordinates for proper methods of installation procedure in accomplishing the works and use of equipment.
· Provide administrative and technical supervision to 12 Telephone Installer.
·Conduct worksite inspection, Review and spot check works for safety, quality and quantity of work that have been accomplished. Maintain records for references.
|
|
| Company: |
Siemens AG, Public Communication Network |
| City / Country: |
Riyadh, Kingdom of Saudi Arabia |
| Position: |
Installation Supervisor |
| Start date: |
01 Jul,1993 |
| End date: |
01 Dec,1994 |
Responsibilities:
·Plans, sequence of work operation for group supervised.
·Assign; direct the work in the telecommunication installation of Digital Electronic Switching System (EWSD).
·Explain work to be accomplished, methods, sequences and priorities to be installed.
·Prepare necessary tools, materials and equipment needed for installation.
·Interpret blueprints and similar instructions approved by the Ministry of Post Telephone and Telegraph, KSA.
·Installation of power for EWSD Switching equipment.
·Installation of Transmission equipment and termination of Digital Line Unit cables.
·Provide administrative and technical supervision to 6 Telephone Installer.
|
|
| Company: |
ABV Rock Group KB, Telecom Department |
| City / Country: |
Riyadh, Saudi Arabia |
| Position: |
General Foreman Telecom |
| Start date: |
01 Mar,1991 |
| End date: |
01 May,1993 |
Responsibilities:
Supervised, assign and direct subordinates engaged in telecommunication installation and electronics repair, maintenance and operations.
·Prepare necessary tools, materials and equipment needed for installation.
. Installation and maintenance of PABX ERICSON MD-110 telephone equipment’s. Installation and layout of fiber optic cable, telephone cable and office telephone networks.
·Repair and maintenance of voltage regulator, UPS (uninterrupted power supply), Grid Manipulator joysticks and control, electronic welding machine equipment and other electronic equipment parts of a production machinery.
·Provide administrative and technical supervision to 6 Telephone Installer 2 Electronics Technician.
|
|
| Company: |
United States of America Naval Facilities |
| City / Country: |
Subic Naval Base Philippines |
| Position: |
Electronics Mechanic Foreman 1 |
| Start date: |
01 Nov,1978 |
| End date: |
01 Mar,1991 |
Responsibilities:
· Provide administrative and technical supervision to 5 electronic mechanics, 4 elex. apprentices, 3 electrician, 3 plumbers and 1 machinist.
· Supervised and assign works to Electronics Technician, Electrician, Plumber, Apprentices and machinist in the repair and maintenance of Fire Protection System such as Fire Alarm System, Sprinkler System, Dry Chemical System, Cardox C02system and Saltwater fire protections.
· Supervise Electricians engaged in electrical installations of Fire Alarm System, power panels, conduit installations and its wiring, troubleshooting of controllers.
· Supervise Electronics Technician engaged in Operations and Maintenance of Automated Radar Communications and computerized equipment such as Air to Ground navigational communications equipments, VHF-UHF radios, microvave, VHF omni range, antenna and others.
|
| Languages |
| Language: |
English |
| Spoken level: |
Fluent |
| Written level: |
Fluent |
| Additional |
Computer skills:
MS Word, Excel, Visio, Powerpoit |
Other skills:
Drivinr, Electricians |
| Vacancy |
| Category: |
Administrative Network Coordination, Construction, Customer Support, Distribution & Supply Chain, Engineering Deployment, Installation, Product Management, Project Management, Supervision, Tech Support, Technical Management, Top Management |
| Timing: |
Full Time, Part Time |
| Place of work/Country: |
Afghanistan, Albania, Algeria, American Samoa, Andorra, Angola, Antigua and Barbuda, Argentina, Armenia, Aruba, Ascension, Australia, Australian Ext. Territory, Austria, Azerbaijan, Bahamas, Bahrain, Bangladesh, Barbados, Belarus, Belgium, Belize, Benin, Bhutan, Bolivia, Bosnia, Botswana, Brazil, Brunei Darussalam, Bulgaria, Burkina Faso, Burundi, Cambodia, Cameroon, Canada, Cape Verde, Central African Republic, Chad, Chile, China, Colombia, Comoros, Congo, Congo Democratic Republic, Cook Islands, Costa Rica, Croatia, Cuba, Cyprus, Czech Republic, Denmark, Diego Garcia, Djibouti, Dominica, Dominican Republic, DPR Korea (North), East Timor, Ecuador, Egypt, El Salvador, Equatorial Guinea, Eritrea, Estonia, Ethiopia, F.S. Micronesia, Falkland Islands, Faroe Islands, Fiji, Finland, France, French Polynesia, Gabon, Gambia, Georgia, Germany, Ghana, Gibraltar, Greece, Greenland, Grenada, Guadeloupe, Guatemala, Guiana (French), Guinea, Guinea-Bissau, Guyana, Haiti, Honduras, Hong Kong, Hungary, Iceland, India, Indonesia, Iran, Iraq, Ireland, Israel, Italy, Ivory Coast, Jamaica, Japan, Jordan, Kazakhstan, Kenya, Kiribati, Korea (North), Korea (South), Kuwait, Kyrgyz Republic, Laos, Latvia, Lebanon, Lesotho, Liberia, Libya, Liechtenstein, Lithuania, Luxembourg, Macau, Macedonia, Madagascar, Malawi, Malaysia, Maldives, Mali, Malta, Marshall Islands, Martinique, Mauritania, Mauritius, Mayotte, Comoros Is., Mexico, Micronesia, Moldova, Monaco, Mongolia, Morocco, Mozambique, Myanmar (Burma), Namibia, Nauru, Nepal, Netherlands, Netherlands Antilles, New Caledonia, New Zealand, Nicaragua, Niger, Nigeria, Niue, Norway, Oman, Pakistan, Palau, Palestine, Panama, Papua New Guinea, Paraguay, Peru, Philippines, Poland, Portugal, Qatar, Reunion Island, Romania, Russia, Rwanda, Saint Helena, Saint Kitts & Nevis, Saint Lucia, Saint Vincent and the Grenadines, San Marino, Sao Tome & Principe, Saudi Arabia, Senegal, Seychelles, Sierra Leone, Singapore, Slovakia, Slovenia, Solomon Islands, Somalia, South Africa, Spain, Sri Lanka, St Pierre & Miquelon, Sudan, Suriname, Swaziland, Sweden, Switzerland, Syria, Taiwan, Tajikistan, Tanzania, Thailand, Togo, Tokelau, Tonga, Tunisia, Turkey, Turkmenistan, Tuvalu, Uganda, Ukraine, United Arab Emirates, United Kingdom, Uruguay, USA, Uzbekistan, Vanuatu, Vatican City (use +39), Venezuela, Vietnam, Wallis and Futuna, Western Samoa, Yemen, Yugoslavia, Zambia, Zimbabwe |
| Minimum Salary: |
4000 $ |
Motivation / Comments / Requests:
A top notch professional with passion for excellence. Manages challenges and pressures pretty well. Fluent in written and spoken english.
·Experienced in the Planning, Installation, Comissioning & Maintenance Services of all kinds of AT&T/Lucent equipment’s such as 5ESS Switching Equipments,CDMA(Code Division Multiple Access equipments), RCS(Radio Carrier stations), Transmission equipments such as SDH/ISM 2000, DACS 5, DACS6, DACS 4/4/1, DACS II, WAVESTAR OLS80G, SLM 2000, SLR 2000, WAVESTAR ADM 16/1, ADM4, ANYMEDIA ACCESS System, ATM Access, Motorola GSM equipments such as RBS, BSC, MSC, AT&T-LUCENT POWER PLANT and Installation of DIGITAL CROSS CONNECT and Implemetation of Circuit Work Order (CWO). |
|
|
| Telecom Job Search Engine Statistics |
Telecom Vacancies in database: 985
Telecom Resumes in database: 111
Users Online: 44
|
|
| Telecom Job Search Engine Contacts |
| If you have any constructive thoughts, creative ideas, or reasonable offers, please, contact us immediately via e-mail
|
|
|
|